Trails Project Update – November 15, 2024

The Board has heard the community’s frustration with the progress of the Trail Improvement Project and provides the following update on the project schedule:

  • The trail rehabilitation project was originally intended to start over the summer. Unfortunately, we were unable to get the necessary permissions to begin work until the fall.
  • The sidewalk along Coles Crossing Drive (near Bowden Creek Drive) will be poured and reopened within the next week. The Board hopes this will alleviate pedestrian traffic to/from Sampson Elementary.
  • Before the trail was demolished, we had to make assumptions about the conditions of the ground beneath the trail. Our schedule and the subsequent trail closure was based on those assumptions. Once the contractor removed the existing trail, they discovered unforeseen conditions that required further testing and potential modifications to the construction of the new trail. This testing is nearly complete. The District’s landscape architect expects to receive the information they need within the next week to determine if any changes are necessary.
  • Simultaneous with the start of MUD 364’s trail project, MUD 365 discovered that critical drainage infrastructure underneath the trails needs to be repaired and potentially replaced. To avoid costly repairs to newly poured trails, we have been forced to stop work on the trails while we determine the extent of the drainage repairs. MUD 364 is coordinating with MUD 365 to align the schedule for the drainage repair work with the remainder of MUD 364’s trail project.

While the Board understands the community’s frustration on the lengthy trail closure, please know that we continue to press the trail project contractor to work swiftly and are committed to keeping the community informed on the progress and timeline going forward.

Please refer back to this page for future updates on the project and timeline for reopening the trails. The Board will provide an updated general schedule for each phase in the next update.

By |2024-11-15T14:45:33-06:00November 15th, 2024|Latest News, Trails Project|

Trails Project Update – Construction Set to Begin Soon!

Demolition of the entire MUD 364 trail system is complete and construction of Phase 1 of the new trail is set to begin within the next two weeks. As a reminder, the entire MUD 364 trail system remains closed until all phases of the project are complete. Please help us keep our project on track by adhering to the closure and staying out of fenced areas, for your safety and the safety of others.

The Board is aware that the sidewalk closure along Coles Crossing Drive, opposite Cypress Hall, has created an inconvenience for children walking and biking to Sampson. We have asked the contractor to complete that stretch of sidewalk as soon as possible to provide more space for pedestrians. We hope to have it reopened in about three weeks, weather permitting.

We will continue to post updates as the project progresses, so please check back regularly.

By |2024-10-28T17:22:05-05:00October 28th, 2024|Latest News, Trails Project|

MUD 364 Trails Remain Closed Until Project Completion.

*PLEASE NOTE*

As a reminder, the entire MUD 364 trail system is currently closed while the District completes its Trail Improvements Project. The trails are fenced off while the contractor continues demolition of the existing trail and construction of the new trail. While work may not be actively in progress, the fenced area is part of the project site and residents must stay out of the area for their safety and the security of the project site.
The MUD 364 Board appreciates the community’s cooperation as the District works to improve a vital part of the community!

By |2024-10-28T16:46:37-05:00October 17th, 2024|Latest News, Trails Project|

Notice of Election

2024 Directors Election Information

Election Day is Tuesday, November 5, 2024. Voting locations are open from 7:00 a.m. to 7:00 p.m.

Early Voting begins on Monday, October 21, 2024 and ends on November 1, 2024.

Specific Early Voting days and times can be found at: https://www.harrisvotes.com/Vote-Centers.

All Election Day and Early Voting locations can be found at: https://www.harrisvotes.com/Vote-Centers.

For more information, visit https://www.mud364.com/elections/

 

Información sobre las elecciones de directores de 2024

El día de las elecciones es el martes 5 de noviembre de 2024. Los lugares de votación están abiertos de 7:00 a. m. a 7:00 p. m.

La votación anticipada comienza el lunes 21 de octubre de 2024 y finaliza el 1 de noviembre de 2024.

Los días y horarios específicos de la votación anticipada se pueden encontrar en: https://www.harrisvotes.com/Vote-Centers.

Todos los lugares de votación anticipada y el día de las elecciones se pueden encontrar en: https://www.harrisvotes.com/Vote-Centers.

Para obtener más información, visite https://www.mud364.com/elections/

 

2024 年董事選舉信息

選舉日為 2024 年 11 月 5 日星期二。投票地點的開放時間為上午 7:00 至晚上 7:00。
提前投票於 2024 年 10 月 21 日星期一開始,於 2024 年 11 月 1 日結束。具體提前投票
日期和時間可在 https://www.harrisvotes.com/Vote-Centers 上找到。
所有選舉日和提前投票地點均可在 https://www.harrisvotes.com/Vote-Centers 上找到。
欲了解更多信息,請訪問 https://www.mud364.com/elections/

 

Thông tin Bầu cử Giám đốc năm 2024

Ngày Bầu cử là Thứ Ba, ngày 5 tháng 11 năm 2024. Các địa điểm bỏ phiếu mở cửa từ 7:00 sáng đến 7:00 tối.

Bỏ phiếu sớm bắt đầu vào Thứ Hai, ngày 21 tháng 10 năm 2024 và kết thúc vào
ngày 1 tháng 11 năm 2024. Ngày và giờ Bỏ phiếu sớm cụ thể có thể được tìm thấy tại https://www.harrisvotes.com/Vote-Centers.
Tất cả các địa điểm Bỏ phiếu sớm và Ngày Bầu cử có thể được tìm thấy tại https://www.harrisvotes.com/Vote-Centers.
Để biết thêm thông tin, hãy truy cập https://www.mud364.com/elections/

By |2024-10-14T14:52:39-05:00October 14th, 2024|Latest News|

NHCRWA Fee Decrease- Sept. 2024

At its September 16, 2024, Regular Board Meeting, the Board of Directors of the North Harris County Regional Water Authority (NHCRWA) voted to reduce surface water rates and groundwater pumpage fees. The NHCRWA reduced surface water rates from $4.05 to $3.05 per 1,000 gallons and groundwater pumpage fees from $3.60 to $2.60 per 1,000 gallons. The reduced rates went into effect on October 1, 2024.

The NHCRWA fees are set by the NHCRWA Board and charged to all municipal utility districts (MUDs) in the NHCRWA’s jurisdiction, including MUD 364. The fees are passed on to all customers via a line item on the monthly water bill based on your monthly water usage.

For more information about the NHCRWA, please visit their website at:  https://www.nhcrwa.com/

By |2024-10-03T15:16:04-05:00October 3rd, 2024|Latest News|

Debris Separation Guide and Pick Up

Harris County Precinct 3 to Begin Collecting Residential Vegetative Debris on July 15, 2024

Beginning Monday, July 15, 2024, Harris County Precinct 3 crews will be collecting storm-related residential vegetative debris left on the curb.   Residents should report their debris to Precinct 3 by calling 713-274-3100 or submitting their location at pct3.com/service-request.

Residents must follow the instructions in the Debris Separation Guide provided below to ensure that their debris is collected.

By |2024-07-19T13:35:59-05:00July 15th, 2024|Latest News|

Sanitary Sewer Cleaning and Televising Project – Sections 9 and 10

HCMUD 364 will begin cleaning and inspecting the sanitary sewer system in Coles Crossing, Sections 9 and 10.

Doorhangers will be distributed to homes in the affected areas prior to the start of the project. If a sewer manhole is located on your property, contractors may need to gain access to your property. Your cooperation is appreciated.

The project is expected to begin on or around Monday, May 20 and will continue through the beginning of July. The contractor for this project is Pipe View America.

If any problems with your sewer service occur during the work, please contact the District’s Operator, Municipal Operations & Consulting, at 281-367-5511.

If you have any other questions about this project, please contact the District’s Engineer, Mr. Mark S. Cervantes, P.E. with Vogler & Spencer Engineering, Inc. at 713-782-0042.

By |2024-05-16T15:00:00-05:00May 16th, 2024|Latest News|
Go to Top