MUD 364 is conducting an underground sewer televising project throughout the District. The results from Sections 9 and 10 identified some issues that need to be addressed, including areas where the lines are sagging and are not fully transporting waste products to the sanitary lift station and on to the sewer treatment plant.

To ensure the ongoing reliability of our sewer infrastructure, MUD 364 has opted to begin those repairs. This project will require excavation of some sidewalks and driveways. Over the next few weeks, the District and the Contractor will provide residents with notice of when the excavation work will begin. Residents directly impacted by the removal of a driveway or sidewalk will also be notified by certified mail.

The Contractor is required to provide notice 24 – 48 hours before beginning work on or adjacent to your property. The work will not require residents to be home and at no time will field crews enter your home. Any pavement, grass, fencing, trees, landscaping, or sprinklers that are damaged during construction will be restored by the Contractor at no cost to the resident.

The Board of Directors of MUD 364 is committed to providing every residence with superior water and sewer infrastructure and we appreciate your patience as we make these necessary repairs.

Questions?
If you have any questions about the project, please contact our engineer.

Mark Cervantes, P.E.
Volger & Spencer Engineering, LLC
713-782-0042